Your sprints drift.We catch it first.
Northset reads the signals between your tools and alerts the one person positioned to correct course.
Standup notes are in the doc. Two tickets moved to review last night.
I'll pick up the checkout ticket after the design sync.

Jordan's PR CHK-318 is 640 lines and has been open 3 days with no reviewer. PRs this size take about 2 days to review and revise, and the sprint closes in 2. Assign a reviewer today to land it.
Good catch — pinging the team now so it doesn't sit.
Example
One message. Sent before it's too late.
4+ days
Average wait before a PR gets its first review — ~1M PRs analyzed (LinearB)
40%
Mid-sprint scope creep that signals an overloaded sprint (Harness)
30+ sessions
Voice-of-customer interviews: 2 CEOs, 2 CTOs, 3 VPs, 9 team leads
Voice of customer
“Finally, no dashboards.”
Director of AI Engineering
Voice-of-customer session · June 2026
“You can't just get product info from Jira. It's in all the places we work like Jira and GitHub.”
Team Lead, Platform
“I want that now.”
VP of Engineering
- 30+ sessions
- 2 CEOs
- 2 CTOs
- 3 VPs
- 9 team leads
- 15+ engineers
No dashboards.
One message, when it matters.
Learns your team's patterns.
Gets sharper every sprint.
Connects in ten minutes.
Jira, GitHub, Slack.
Jira shows what happened. Northset tells you what's coming.
The problem
See sprint risk early enough to do something about it.
4+ days
Average wait before a pull request gets its first review
~1M PRs analyzed
40%
Mid-sprint scope creep above this level signals an overloaded sprint
Sprint metrics dataset
30+ sessions
Leaders told us sprint slippage is discovered at the retro, after the sprint is already lost
Voice-of-customer interviews · 2 CEOs, 2 CTOs, 3 VPs, 9 team leads
How it works
Know if you’re overcommitted before anyone pulls a ticket.
Checks commitment accuracy, unplanned work history, and carry-over risk.
Standup notes are in the doc. Two tickets moved to review last night.
I'll pick up the checkout ticket after the design sync.

Sprint kickoff
Sprint 15 is committed at 47 points. Team average is 38. Mid-sprint additions typically add 6 points. Recommend removing 15 points before kickoff to secure delivery.

Sprint kickoff
Alex has a PR from last sprint with unaddressed feedback, and 8 points of work in Sprint 15. Remove 2 points before kickoff to account for the outstanding work.
Good catch — pinging the team now so it doesn't sit.
Example
Sent before standup. While you can still change the plan.
Surface blockers while there’s still time to act.
Detects PR bottlenecks, scope creep impact, and live trajectory state.
Support escalated two more bugs overnight — I added them to Sprint 15.
Also pulled BILL-402 in, it's small.

Scope creep
Sprint 15 has taken on 11 unplanned points since kickoff, 42% above the committed scope. Two committed tickets now have no room left in the sprint. Drop or defer 8 points today to protect the commitment.
Fair — I'll move the two bug tickets to next sprint.
One message per signal. Sent to the right person, not the whole channel.
Turn sprint data into forward-looking recommendations.
Surfaces estimation patterns, recurring friction, and intervention effectiveness.
Standup notes are in the doc. Two tickets moved to review last night.
I'll pick up the checkout ticket after the design sync.

Sprint 12 close
3 tickets took more than 1.5x their estimated points to close this sprint and last. Estimation may be consistently off for complex work. Review these tickets before Sprint 13 planning.

Sprint 12 close
Unplanned additions averaged 6 points over the last 2 sprints, up from 4. Sprint 13 capacity has been adjusted to account for 6 points of unplanned work.
Good catch — pinging the team now so it doesn't sit.
Named. Quantified. Something you can act on.
Know if you’re overcommitted before anyone pulls a ticket.
Checks commitment accuracy, unplanned work history, and carry-over risk.
Standup notes are in the doc. Two tickets moved to review last night.
I'll pick up the checkout ticket after the design sync.

Sprint kickoff
Sprint 15 is committed at 47 points. Team average is 38. Mid-sprint additions typically add 6 points. Recommend removing 15 points before kickoff to secure delivery.

Sprint kickoff
Alex has a PR from last sprint with unaddressed feedback, and 8 points of work in Sprint 15. Remove 2 points before kickoff to account for the outstanding work.
Good catch — pinging the team now so it doesn't sit.
Example
Sent before standup. While you can still change the plan.
For managers
By the time they ask, you already have the answer.
Northset gives the manager an early, honest read on whether the team will hit its commitment, with the lead time to act on it.
Early enough to act on. You own the decision.
Standup notes are in the doc. Two tickets moved to review last night.
I'll pick up the checkout ticket after the design sync.

Sprint 15 is tracking behind its commitment with 4 days left. The gap is review wait time on two open PRs. Clear them this week and the team is back on track to deliver.
Good catch — pinging the team now so it doesn't sit.
Example
Setup
Connected in ten minutes. Northset starts learning from sprint one.
Connect GitHub.
Reads your pull requests. Nothing to install.
Connect Jira.
Reads sprint dates, tickets, and dependencies.
Connect Slack.
Posts to the right person in the right channel.
Security
Your data, on your terms.
Read-only access to Jira, GitHub, and Slack. Except Slack alerts, Northset never writes to your tools.
Northset never reads your code, only pull request metadata.
You control who gets messaged. Alert structure is created with your approval.
Leave anytime.
Design partner program
Work directly with the founders for one month.
Full product, free. A direct line to the founders. In exchange: honest feedback, and a reference if we earn it.
Week 1
Connect GitHub, Jira, and Slack in under ten minutes. Northset starts learning your team's patterns.
Weeks 2 to 3
First alerts land in Slack. You tell us what is signal and what is noise.
Week 4
We review what Northset caught and tune it to your team.
Free during the program. Read-only access. You control who gets messaged. Leave anytime.
FAQ
Common questions
Design partner program
Your next sprint starts soon.
Apply now to work directly with the founders for the next month.
Apply to be a design partner